Completed Projects

Remodel:
The Metropolitan Apartments, San Mateo

View >

Extensive tenant improvement modifications included new lighting, flooring, doors, cabinetry, ceiling and wall coverings and offices, plus the clubhouse and leasing office.
Approximate value: $650,000

Renovation:
The Metropolitan Apartments Clubhouse, San Mateo

View >

Extensive interior tenant improvements were made to the property’s community clubhouse.
Approximate value: $750,000

Renovation:
Rincon Apartments, San Jose

View >

An 8-building, 246-unit residential apartment complex required the complete replacement of cement board siding and windows and renovation of walkways and balconies.
Approximate value: $7.5 million

Remodel:
Single Family Residence, Berkeley

View >

Scope of work included foundation and the installation of a structural steel frame, installation of new decks and windows, new kitchen and bathrooms.
Approximate value: $750,000

Renovation:
Cavallo Point Lodge Spa, Sausalito

View >

Fast-track repairs to men’s and women’s spa locker rooms included reconstruction of showers and steam rooms to address deficient tile waterproofing assemblies. Extensive pre-planning required to enable the completion of comprehensive repairs within a 20-day time period.
Approximate value: $475,000

Waterproofing:
Creekside Commercial, San Leandro

View >

The project included the installation of a new stucco waterproofing overlay system on 2 four-story office buildings; approximately 70,000 sq. ft. total.
Approximate value: $1.5 million

Reconstruction:
Dental office, San Francisco

View >

Specialized tenant improvement was required to excavate and replace a defective sewer line.
Approximate value: $350,000

Renovation:
St. Dominic’s Church, Benicia

View >

Originally constructed in 1890, this historical landmark received a renovation of its entire façade. Scope of work included renovation of original woodwork, plaster detailing, new roof, paint and the installation of custom built copper cupolas.
Approximate value: $500,000

Renovation:
Miramar Apartments, Foster City

View >

Work on this 3-building, 159-unit complex included the exterior renovation of private balcony stacks and elevated entry walkway structures.
Approximate value: $7 million

Renovation/Reconstruction:
Liquid Sugar Townhomes, Emeryville

View >

This comprehensive renovation included complete stucco, window and roof replacement, plus reconstruction of walkways and private balconies for a 6-building, 55-unit residential property.
Approximate value: $7.5 million

Remediation/Renovation/Reconstruction:
7th St., San Francisco

View >

This 5-story 12-unit townhouse complex required extensive exterior renovation. Work included the remediation of significant decay at an inaccessible rear elevation, and reconstruction of a large roof deck. All labor and materials for repairs to the rear of the building had to be accessed over the roof.
Approximate value: $950,000